MBR Equipment for Industrial Wastewater Grey Water Treatment

MBR Equipment for Industrial Wastewater Grey Water Treatment
Product Details

Application of MBR bioreactor:

General statement

For the new water treatment technology in the world in the 1990 s, it will be the sewage biological treatment technology and the combination of membrane separation technology, using biological technology to degradation of the organic matter in the water first, fungi, blocking bacteria domesticated advantage, and then using membrane technology filtering suspended solids and water soluble macromolecular substances, reduce the water turbidity, achieve discharge standards.

Membrane bioreactor technology can be widely used in wastewater treatment and water reuse.

CCAS technology

The Continuous Cycle Aeration System is a Continuous water - type SBR Aeration System.

The CCAS of sewage treatment process is improved on the basis of SBR (Sequencing Batch Reactor, sequential Batch processing).

CCAS sewage treatment technology is not high in the pretreatment of sewage treatment, and only the mechanical grille and the sink pool of 15mm gap are established.

The core of biological treatment is the CCAS reaction pool. The functions of phosphorus removal, denitrification, degradation of organics and suspended objects are all completed within the pool, and the discharge of water can be met.

Unique advantages of CCAS in sewage treatment process:

(1) when aeration, the sewage and sludge treated by CCAS sewage are in a completely ideal mixing state, guaranteeing the removal rate of BOD and COD, and the removal rate is as high as 95%.

(2) the "aerobic - a lack of oxygen," and "aerobic and anaerobic" repeatedly running mode to strengthen the phosphorus absorption and nitrification - denitrification, the nitrogen and phosphorus removal rate above 80%, and ensure the qualified water indicators.

(3) when settling, the entire CCAS reaction pool is in a completely ideal precipitation state, making the effluent suspension extremely low, and the low value also guarantees the removal effect of phosphorus.

CCAS sewage treatment technique are the shortcomings of the pond and intermittent operation, manual control is almost impossible, because of computer control, personnel quality requirements for the management of the plant is very high, for the design, training, installation, debugging and so on a strict work.

Product description:

Certification: ISO9001,CE, ISO14001, OHSAS18001 etc

Price: Negotiable

Voltage: 380V 50Hz, the voltage can be as local demand

Payment term: Unionpay transfer

Delivery date: Negotiable

Packing: export standard

Market: Middle East/ Africa/Asia/South America/Europe/North America

Warranty: 1 year

MOQ: 1 set

FAQ

1.If I need to stay in your place for a few days, can you book a hotel for me?

I am very happy that hotel reservation service is available..

2.What is the quality of your product?

So far, we have certificates like CNAB, CQGC, CQZX, etc.

3.What's the delivery time for your machine?

Generally speaking, the delivery time of our machines is about 30 days, and the customized machines will negotiate with our customers.

Contact Below:

Company: Wuxi Blue Sky Water Treatment Equipment Co., Ltd.

Attn: Mr.Zhang

Mobile: +86-18915268218

Tel: +86-0510-82360800

Email: zy@openskywx.com

Web: www.blueskywx.com

Add: No 5,rongqiang Road, Wuxi city, Jiangsu Prov, china

remarks:Main Equipments  Packages  Testing Devices  Delivery:

By Express

1kg-50kg

By Air

50kg-500kg

By Sea

500kg or more


Feedback